Installation of boiler burner

2024-11-09 16:55

When storing, use a gourd to hold the lower part of the burner to prevent it from swinging.

1. When storing, use a gourd to hold the lower part of the burner to prevent it from swinging.
2. The steel wire rope must not be removed from storage until the nozzle is aligned and welded.
3. When hanging and storing steel wire ropes on boiler steel frame beams, it is required to use corner protection for the steel wire ropes. When using chain hoists to hang components, the hanging time should not exceed 24 hours.
4. When walking on steel beams at high altitude, it is necessary to pull the safety rope in advance and use the safety belt at the same time. When climbing the steel column vertically, a climbing self-locking device should be used.
5. When the wind exceeds level 6, lifting operations should be stopped and windproof measures should be taken. Outdoor installation work should be stopped during heavy rain weather.
7. If installation requires opening holes on the platform or removing the grid plate, the boiler project must be notified and a construction work permit must be obtained. After the installation work is completed, the platform must be restored to its original state.
8. High altitude workers should carry small tools and leftover materials in tool bags, and tie protective ropes around the tools to prevent injury from falling objects from high altitude.
9. After the construction is completed on the same day, it is necessary to insist on cleaning the site, ensuring that the work is finished, the materials are used up, and the site is cleared.
10. Take anti slip and anti leakage measures when working in damp places or on rainy days.
11. When lifting the nozzle, hemp rope should be used as the cable wind rope to avoid collision.
12. The steel wire rope, snap ring, hoist and other tools used must be inspected and tested before use, and can only be used after passing the inspection.
13. When lifting heavy objects with a crane, there must be a qualified driver to operate and a crane operator to command

What are the tasks of industrial boilers and boiler room equipment

The main task of boilers and their ancillary equipment is to produce steam .

2024-11-09

Reasons and analysis of the detachment of the central cylinder of the boiler cyclone separator

The vast majority of center tube detachment is due to improper design.

2024-11-09